March 30, 2018
A detour for construction on the Rolling Meadows Road (Route 2026) bridge, which spans Laurel Run in Franklin Township, Greene County has been postponed. The construction will require a two-week detour now beginning on April 9.
During construction, drivers will be directed to follow a detour along East Roy Furman Highway (Route 21) to Rolling Meadows Road (Route 2026).
In the event of unfavorable weather or unforeseen activities, this schedule may change.
This bridge is referred to as JV-513 and is one out of the 558 bridges being replaced under the Rapid Bridge Replacement Project. JV references the joint-venture partnership between Walsh/Granite, which is leading construction for the entire project.