August 27, 2018
The Thatcher Road (Route 1004) bridge, which spans Hendricks Creek in Fairfield Township, Westmoreland County, reopened to traffic on Friday, August 24. This bridge was replaced as part of the Pennsylvania Department of Transportation's (PennDOT) Rapid Bridge Replacement Project.
With the bridge reopened, motorists may notice a slight bump as they drive across the bridge until a polyester polymer concrete (PPC) overlay is applied to the deck. This is often the final step in completing box beam bridge projects. The PPC overlay is designed to protect the deck from the wear and tear brought about by Pennsylvania’s harsh winters and reduce the long-term maintenance costs.
The polyester material can only be applied when temperatures are consistently above 40 degrees, dry weather is forecasted and after the bridge concrete has cured for at least 30 days. An alternating traffic pattern will be controlled by flaggers when the PPC overlay is applied in Fall 2018.
To find out when the overlay will be applied to this structure, visit www.parapidbridges.com/polyesterpolymerconcreteoverlay.html. In the event of unfavorable weather, this schedule may change. Any such changes will be posted on the website.
This bridge is referred to as JV-551 and is one out of the 558 bridges being replaced under the Rapid Bridge Replacement Project. JV references the joint-venture partnership between Walsh/Granite, which is leading construction for the entire project. Replacement work for this bridge was performed by C.H. & D. Enterprises Inc. of New Stanton, PA.